SciELO - Scientific Electronic Library Online

 
vol.12 issue5Optical Character Recognition Based Speech Synthesis System Using LabVIEWSimulation of Control of a Scara Robot Actuated by Pneumatic Artificial Muscles Using RNAPM author indexsubject indexsearch form
Home Pagealphabetic serial listing  

Services on Demand

Journal

Article

Indicators

Related links

  • Have no similar articlesSimilars in SciELO

Share


Journal of applied research and technology

On-line version ISSN 2448-6736Print version ISSN 1665-6423

Abstract

MOLAVI, M.; HAMZELI, H.  and  DALFARD, V.M.. Multi-Objective Lead-Time Control Problem with Stochastic Constraints. J. appl. res. technol [online]. 2014, vol.12, n.5, pp.927-938. ISSN 2448-6736.

This research intends to find out any development of a robust multi-objective for lead time optimal control problem in a multi-stage assembly system model. Assembly system modeling is possible by the help of the open queue network. A working station includes one or infinite servers and just manufacturing or assembly operations are performed therein. Each part has a separate entry process and independent of each other. It is completely based upon Poisson process.Serving Lead Time of Stations are also independent of each other and therefore exponential distribution of each parameter is controllable. All stations have bounded uncertain unrecyclable wastes which are completely independent in compliance with Erlang distribution. Uncertainty in the problem parameters has been suggested as robust multi-objective optimal control model in which we have three incompatible target functions including cyclic operation cost minimization, average lead time minimization and lead time variance. Finally, target progress method has been applied in order to achieve serving optimal speeds and solve discrete time of the main problem approximately. The proposed model could present a suitable solution even for the same problem as mentioned in other related papers along with some considerable results in parameter uncertainty conditions.

Keywords : Multi-objective planning; robust optimization; lead time control; queue theory; complex assembly system.

        · text in English

 

Creative Commons License All the contents of this journal, except where otherwise noted, is licensed under a Creative Commons Attribution License