SciELO - Scientific Electronic Library Online

 
vol.15 issue31Environmental awareness in students at the university of Sonora author indexsubject indexsearch form
Home Pagealphabetic serial listing  

Services on Demand

Journal

Article

Indicators

Related links

  • Have no similar articlesSimilars in SciELO

Share


Epistemus (Sonora)

On-line version ISSN 2007-8196Print version ISSN 2007-4530

Abstract

GRANICH ARMENTA, Gladys Irasema  and  ANAYA PEREZ, Maria Elena. Methodology for improvement capacity installed in a production line of salted peanuts. Epistemus (Sonora) [online]. 2021, vol.15, n.31, pp.87-94.  Epub May 26, 2023. ISSN 2007-8196.  https://doi.org/10.36790/epistemus.v15i31.165.

The project focuses on the production capacity analysis in a company that produces salty peanut botanero which currently carries out its activities in a non-industrialized way, omitting the adequate standardization, so it is affected by the demand or the projected objectives in the local market. According mentioned and based on its growth and planned demand for the next 5 years, a proposal is prepared in order to meet that objective. The installed capacity could supply 67,410 pieces annually when sales of more than 158,760 pieces were forecast. The comparative analysis carried out between two alternatives related to the acquisition of new machinery or hiring of operators to increase the workforce, to the production area.

Keywords : Installed Capacity; Peanuts; Cost Analysis; SIPOC.

        · abstract in Spanish     · text in Spanish