Servicios Personalizados
Revista
Articulo
Indicadores
- Citado por SciELO
- Accesos
Links relacionados
- Similares en SciELO
Compartir
Journal of applied research and technology
versión On-line ISSN 2448-6736versión impresa ISSN 1665-6423
Resumen
SHEN, C.-C.. Discussion on key successful factors of TPM in enterprises. J. appl. res. technol [online]. 2015, vol.13, n.3, pp.425-427. ISSN 2448-6736.
It generally takes 2.5 to 3 years for an enterprise to implement TPM in a full swing; however, the actual duration depends on each company's corporate status. Generally speaking, for a company with big staff, it even takes 3 to 5 years, but the major consideration should depend on whether the actual benefit is remarkable or not. This research aims to find out whether total productive maintenance (TPM) was carried out by enterprises, to inspect the enterprises' current performance, and to make comparison with those enterprises that have successfully carried out TPM. Through the findings, we hope to provide reference for enterprise owners when they carry out TPM, so as to reduce the cost for fumble.
Palabras llave : TPM; Total productive maintenance; Competitiveness.