SciELO - Scientific Electronic Library Online

 
vol.13 número3Reliability optimization of electrical distribution systems using internal loops to minimize energy not-supplied (ENS)A proposed method for design of test cases for economic analysis in power systems índice de autoresíndice de materiabúsqueda de artículos
Home Pagelista alfabética de revistas  

Servicios Personalizados

Revista

Articulo

Indicadores

Links relacionados

  • No hay artículos similaresSimilares en SciELO

Compartir


Journal of applied research and technology

versión On-line ISSN 2448-6736versión impresa ISSN 1665-6423

Resumen

SHEN, C.-C.. Discussion on key successful factors of TPM in enterprises. J. appl. res. technol [online]. 2015, vol.13, n.3, pp.425-427. ISSN 2448-6736.

It generally takes 2.5 to 3 years for an enterprise to implement TPM in a full swing; however, the actual duration depends on each company's corporate status. Generally speaking, for a company with big staff, it even takes 3 to 5 years, but the major consideration should depend on whether the actual benefit is remarkable or not. This research aims to find out whether total productive maintenance (TPM) was carried out by enterprises, to inspect the enterprises' current performance, and to make comparison with those enterprises that have successfully carried out TPM. Through the findings, we hope to provide reference for enterprise owners when they carry out TPM, so as to reduce the cost for fumble.

Palabras llave : TPM; Total productive maintenance; Competitiveness.

        · texto en Inglés

 

Creative Commons License Todo el contenido de esta revista, excepto dónde está identificado, está bajo una Licencia Creative Commons