SciELO - Scientific Electronic Library Online

 
vol.14 número2Identificación de modos cercanos de vibración de una estructura cuasi-axisimétrica: estudio complementarioAnálisis de las irreversibilidades en colectores solares de placas planas no isotérmicos para calentamiento de aire utilizando un modelo adimensional índice de autoresíndice de assuntospesquisa de artigos
Home Pagelista alfabética de periódicos  

Serviços Personalizados

Journal

Artigo

Indicadores

Links relacionados

  • Não possue artigos similaresSimilares em SciELO

Compartilhar


Ingeniería, investigación y tecnología

versão On-line ISSN 2594-0732versão impressa ISSN 1405-7743

Resumo

RODRIGUEZ-GONZALEZ, María Reyes; MOLINA-BURGOS, Judith; JACOME-BURGOS, Alfredo  e  SUAREZ-LOPEZ, Joaquín. Subsurface Vertical Flow Constructed Wetland for Tertiary Treatment of Effluent of Physical-Chemical Process of a Domestic Wastewater Treatment Plant. Ing. invest. y tecnol. [online]. 2013, vol.14, n.2, pp.223-235. ISSN 2594-0732.

In this study two subsurface vertical flow constructed wetlands were operated and fed with the effluent of physical-chemical process of a municipal wastewater treatment plant, one was planted with the specie Iris pseudacorus (HFV2), and the other one unplanted any kind of vegetation (HFV4). The beds had a depth of 0.80 m and were filled with (in cm): 20 coarse-sand, 10 peat moss, 40 fine-gravel and 10 gravel. Three experimental stages were developed with the next hydraulic load (HL): 4.2; 8.3; and 16.6 cm/d (chronological order). The process was evaluated since the steady state was reached. The average removal of COD of the planted wetland with I. pseudacorus was about 81%, whereas into the unplanted substrate was of 68%. This removal of COD was kept constant and was independent of the hydraulic and organic loads. The removal of NH4-N ranged between 75% and 96% in the HFV2, and from 66% to 83% in the HFV4. The high ammonia removal was obtained for the smallest hydraulic load. In the first two phases the performance in removing suspended solids was very low. Most suspended solids removal was observed with maximum hydraulic load that was the last of the series. This suggests that the bed porosity was lost, increasing the efficiency of retention of suspended solids by filtration.

Palavras-chave : constructed wetland; Iris pseudacorus; polish treatment; nitrification.

        · resumo em Espanhol     · texto em Espanhol

 

Creative Commons License Todo o conteúdo deste periódico, exceto onde está identificado, está licenciado sob uma Licença Creative Commons