SciELO - Scientific Electronic Library Online

 
vol.13 número4Analysis of tire-road contact area in a control oriented test bed for dynamic friction modelsProposing a features preprocessing method based on artificial immune and minimum classification errors methods índice de autoresíndice de assuntospesquisa de artigos
Home Pagelista alfabética de periódicos  

Serviços Personalizados

Journal

Artigo

Indicadores

Links relacionados

  • Não possue artigos similaresSimilares em SciELO

Compartilhar


Journal of applied research and technology

versão On-line ISSN 2448-6736versão impressa ISSN 1665-6423

Resumo

CHIU, Y.-S.P.; WU, M.-F.; CHIU, S.W.  e  CHANG, H.-H.. A simplified approach to the multi-item economic production quantity model with scrap, rework, and multi-delivery. J. appl. res. technol [online]. 2015, vol.13, n.4, pp.472-476. ISSN 2448-6736.  https://doi.org/10.1016/j.jart.2015.09.004.

In a recent paper, Chiu et al. (2014) utilized mathematical modeling and differential calculus to determine the common production cycle time that minimizes total production, inventory, and delivery costs for a multi-item economic production quantity (EPQ) model with scrap, rework, and multi-delivery. The present study proposes an algebraic approach substituting the use of differential calculus on the system cost function for deriving the optimal common cycle time in the aforementioned multi-item EPQ model. This simplified approach may enable managing practitioners to resolve real multi-item EPQ models more effectively.

Palavras-chave : Economic production quantity model; Multi-item production; Optimization; Common cycle time; Scrap; Rework; Algebraic approach.

        · texto em Inglês     · Inglês ( pdf )