Servicios Personalizados
Revista
Articulo
Indicadores
- Citado por SciELO
- Accesos
Links relacionados
- Similares en SciELO
Compartir
Journal of applied research and technology
versión On-line ISSN 2448-6736versión impresa ISSN 1665-6423
J. appl. res. technol vol.11 no.3 Ciudad de México jun. 2013
Reexamination of "Combining an alternative multi-delivery policy into economic production lot size problem with partial rework" Using an Alternative Approach
Y-S. P. Chiu,1 K-K. Chen2, F-T. Cheng,3 C-K. Ting*1
1 Department of Industrial Engineering and Management Chaoyang University of Technology Taichung 413, Taiwan. *djk@cyut.edu.tw.
2 Department of Accounting, College of Management National Changhua University of Education Changhua 500, Taiwan.
3 Department of Industrial Engineering & Systems Management Feng Chia University Taichung 407, Taiwan.
ABSTRACT
A conventional approach for solving an economic production quantity (EPQ) model with multi-delivery policy and quality assurance is to use mathematical modeling for deriving the system cost function and to employ differential calculus for proving convexity of the cost function before determining the optimal operating policy. This paper presents a simplified solution procedure to reexamine a specific EPQ model [1] and demonstrates that both, the optimal manufacturing lot size and the long-run cost function can be derived without derivatives. The proposed approach may enable practitioners-with little knowledge of calculus-to understand such a real life vendor-buyer integrated system with ease.
Keywords: manufacturing system, replenishment lot size, discontinuous issuing policy, algebraic approach, imperfect EPQ model, rework.
DESCARGAR ARTÍCULO EN FORMATO PDF
References
[1] S. W. Chiu et al., "Combining an alternative multi-delivery policy into economic production lot size problem with partial rework," Expert Syst. Appl., vol. 39, no. 3, pp. 2578-2583, 2012. [ Links ]
[2] E. W. Taft, "The most economical production lot," Iron Age, vol. 101, pp.1410-1412, 1918. [ Links ]
[3] S. Nahmias, "Production & Operations Analysis," New York, McGraw-Hill, 2009. [ Links ]
[4] W. Shih, "Optimal inventory policies when stock-outs result from defective products," Int. J. Prod. Res., vol. 18, no.6, pp. 677-686, 1980. [ Links ]
[5] M. J. Rosenblatt and H. L. Lee, "Economic production cycles with imperfect production processes," IIE Trans., vol. 18, pp. 48-55, 1986. [ Links ]
[6] R. Schwaller, "EOQ under inspection costs," Prod. Invent. Manage., vol. 29, pp. 22-24, 1988. [ Links ]
[7] M. N. Gopalan and S. Kannan, "Expected duration analysis of a two-stage transfer-line production system subject to inspection and rework," J. Oper. Res. Soc., vol. 45, no. 7, pp. 797-805, 1994. [ Links ]
[8] S. R. Agnihothri and R. S. Kenett, "Impact of defects on a process with rework," Eur. J. Oper. Res., vol. 80, no. 2, pp. 308-327, 1995. [ Links ]
[9] M. Hariga and M. Ben-Daya, "Note: The economic manufacturing lot-sizing problem with imperfect production processes: bounds and optimal solutions," Nav. Res. Log., vol. 45, pp. 423-433, 1998. [ Links ]
[10] E. A. Silver et al., "Inventory Management and Production Planning and Scheduling," New York, John Wiley & Sons, 1998, pp. 151-172. [ Links ]
[11] A. Moini and D. N. P. Murthy, "Optimal lot sizing with unreliable production system," Math. Comput. Model., vol. 31, pp. 245-250, 2000. [ Links ]
[12] B. C. Giri and T. Dohi, "Exact formulation of stochastic EMQ model for an unreliable production system," J. Oper. Res. Soc., vol. 56, no.5, pp. 563-575, 2005. [ Links ]
[13] T. Bautista et al., "A model to design effective Production Improvement Programs," J. Appl. Res. Tech., vol. 8, no. 1, pp. 72-86, 2010. [ Links ]
[14] Y-S. P. Chiu et al., "Mathematical modeling for solving manufacturing run time problem with defective rate and random machine breakdown," Comput. Ind. Eng., vol. 60, no. 4, pp. 576-584, 2011. [ Links ]
[15] A. Vargas-Martínez and L. E. Garza-Castañón, "Combining Artificial Intelligence and Advanced Techniques in Fault-Tolerant Control," J. Appl. Res. Tech., vol. 9, no. 2, pp. 202-226, 2011. [ Links ]
[16] T. J. Lee et al., "On improving replenishment lot size of an integrated manufacturing system with discontinuous issuing policy and imperfect rework," American J. Ind. Bus. Manage., vol. 1, no. 1, pp. 20-29, 2011. [ Links ]
[17] Y-S. P. Chiu et al., "Replenishment run time problem with machine breakdown and failure in rework," Expert Syst. Appl., vol. 39, no. 1, pp. 1291-1297, 2012. [ Links ]
[18] E. Rubio and J. C. Jáuregui-Correa, "A Wavelet Approach to Estimate The Quality of Ground Parts," J. Appl. Res. Tech., vol. 10, no. 1, pp. 28-37, 2012. [ Links ]
[19] S. W. Chiu et al., "Note on the mathematical modeling approach used to determine the replenishment policy for the EMQ model with rework and multiple shipments," Appl. Math. Lett., vol. 25, no. 11, pp. 1964-1968, 2012. [ Links ]
[20] L. B. Schwarz, "A simple continuous review deterministic one-warehouse N-retailer inventory problem," Manage. Sci., vol. 19, pp. 555-566, 1973. [ Links ]
[21] S. K. Goyal, "Integrated inventory model for a single supplier-single customer problem," Int. J. Prod. Res., vol. 15, pp. 107-111, 1977. [ Links ]
[22] A. Banerjee, "A joint economic-lot-size model for purchaser and vendor," Decis. Sci., vol. 17, no. 3, pp. 292-311, 1986. [ Links ]
[23] J. Hahm and C. A. Yano, "The economic lot and delivery scheduling problem: The single item case," Int. J. Prod. Eco., vol. 28, pp. 235-252, 1992. [ Links ]
[24] R. Kohli and H. Park, "Coordinating buyer-seller transactions across multiple products," Manage. Sci., vol. 40, no. 9, pp. 45-50, 1994. [ Links ]
[25] R. M. Hill, "Optimizing a production system with a fixed delivery schedule," J. Oper. Res. Soc., vol. 47, pp. 954-960, 1996. [ Links ]
[26] R. A. Sarker and L. R. Khan, "Optimal batch size for a production system operating under periodic delivery policy," Comput. Ind. Eng., vol. 37, pp. 711-730, 1999. [ Links ]
[27] A. Diponegoro and B. R. Sarker, "Finite horizon planning for a production system with permitted shortage and fixed-interval deliveries," Comput. Oper. Res., vol. 33, no. 8, pp. 2387-2404, 2006. [ Links ]
[28] M. Ben-Daya et al., "The joint economic lot sizing problem: Review and extensions," Eur. J. Oper. Res., vol. 185, no. 2, pp. 726-742, 2008. [ Links ]
[29] S. H. R. Pasandideh et al., "A genetic algorithm for vendor managed inventory control system of multi-product multi-constraint economic order quantity model," Expert Syst. Appl., vol. 38, no. 3, pp. 2708-2716, 2011. [ Links ]
[30] R. W. Grubbström and A. Erdem, "The EOQ with backlogging derived without derivatives," Int. J. Prod. Econ., vol. 59, pp. 529-530, 1999. [ Links ]